answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Aliun
7 days ago
10

(1 point) Let P(t) be the performance level of someone learning a skill as a function of the training time t. The derivative dPd

t represents the rate at which performance improves. If M is the maximum level of performance of which the learner is capable, then a model for learning is given by the differential equation dPdt=k(M−P(t)) where k is a positive constant. a) First solve this differential equation for P(t) using C as your final (simplified) constant parameter introduced by integrating.
Mathematics
1 answer:
tester [11.9K]7 days ago
4 0

Answer:

P(t)=M+Ce^{-kt}

Step-by-step explanation:

The differential model indicates

\dfrac{dP}{dt}=k[M-P(t)]

We need to find P(t) as a solution to the equation.

\dfrac{dP}{dt}=kM-kP(t)\\$Add kP(t) to both sides\\\dfrac{dP}{dt}+kP(t)=kM\\$Taking the integrating factor\\e^{\int k dt} =e^{kt}\\$Multiply all through by the integrating factor\\\dfrac{dP}{dt}e^{kt}+kP(t)e^{kt}=kMe^{kt}\\\dfrac{dP}{dt}e^{kt}=kMe^{kt}\\(Pe^{kt})'=kMe^{kt} dt\\$Take the integral of both sides with respect to t\\\int (Pe^{kt})'=\int kMe^{kt} dt\\Pe^{kt}=kM \int e^{kt} dt\\Pe^{kt}=\dfrac{kM}{k} e^{kt} + C_0, C_0$ a constant of integration

Pe^{kt}=Me^{kt} + C\\$Divide both side by e^{kt}\\P(t)=M+Ce^{-kt}\\P(t)=M+Ce^{-kt}\\$Therefore:\\P(t)=M+Ce^{-kt}

You might be interested in
Solve : A=1/2nal for n
tester [11953]
...z........................
8 0
14 days ago
3.82e+7 in standard form shown in calculator display
babunello [11358]
E+7 indicates 10 raised to the power of 7, which entails shifting the decimal 7 places to the right, resulting in approximately 38200000.0.
3 0
20 days ago
Read 2 more answers
There is a mound of g pounds of gravel in a quarry. Throughout the day, 400 pounds of gravel are added to the mound. Two orders
PIT_PIT [11962]

Question is Incomplete; Complete question is given below;

A pile of g pounds of gravel exists in a quarry. During the day, 400 pounds of gravel is added to the pile. Two orders of 900 pounds are removed, resulting in the mound holding 1,500 pounds of gravel by day's end. Formulate the equation that accurately illustrates this scenario.

Answer:

The equation that best represents the situation is g+400-1800=1300.

Step-by-step explanation:

Given:

Initial gravel amount = 'g'.

Currently Given:

Throughout the day, 400 pounds of gravel is added to the pile.

Thus we can conclude;

Gravel amount after addition = g+400

Also given:

Two orders of 900 pounds are sold and the gravel is taken from the pile.

Hence, two orders of 900 pounds = 2\times 900 = 1800 \ pounds

This leads us to state;

Gravel amount post-removal = g+400-1800

Now Given:

Remaining gravel at the end of day = 1300 pounds.

Therefore, we derive that;

g+400-1800=1300

Consequently, the equation that best describes the scenario is g+400-1800=1300.

3 0
8 days ago
A bicycle factory installs about 400 tires per day. Tires are installed Monday through Friday for 8 hours per day. The manager o
Inessa [12215]
The findings are probably not valid since it is improbable that the tires fitted in just one hour on Monday accurately reflect the whole population of tires.Step-by-step explanation: Out of 8 hours, do you truly believe that one hour could stand for all? This is the reason the results are likely invalid (I also participated in the quiz).
8 0
21 day ago
Read 2 more answers
Ms. Gallegos burns 236 calories riding her bike each hour. She wants to burn more than 590 calories riding her bike at the same
Svet_ta [12367]

Response:

354

Detailed explanation:

5 0
1 month ago
Other questions:
  • The height of a rocket a given number of seconds after it is released is modeled by h (t) = negative 16 t squared + 32 t + 10. W
    13·2 answers
  • Complete the squares so that the differences shown on the outside are correct
    13·2 answers
  • A sample of 75 information systems managers had an average hourly income of $40.75 with a standard deviation of $7.00. The 95% c
    14·1 answer
  • Consider the system of equations. y = 3x + 2 y = − 2 3 x − 4 Explain why these particular equations can be graphed immediately.
    8·2 answers
  • Yoku is putting on sunscreen. He uses 2\text{ ml}2 ml2, start text, space, m, l, end text to cover 50\text{ cm}^250 cm 2 50, sta
    10·2 answers
  • You need to stabilize a flagpole by string in a guy-wire from the top of a flagpole to the ground. The pole is 15 feet tall and
    9·2 answers
  • Two steamers leave a port on a river at the same time, traveling in opposite directions. Each is traveling 22 miles per hour. Ho
    5·2 answers
  • 2. Let f(x) = 3x² -x+5, find f(x+1)​
    9·1 answer
  • Clarissa's income puts her in the bottom tax bracket (10%) last year. During the same year, she earned $250 in dividends and $75
    8·1 answer
  • The are of square frame is 55 square inches. find length of one side frame explain​
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!