A minimum sample size of 75 is necessary. Step-by-step explanation: We need to determine our level, which is calculated by subtracting 1 from the confidence interval divided by 2. Now, we need to find the z value in the Z table that corresponds to a p-value of [Z value]. Therefore, it is the z value with a p-value of [specific value]. Next, we calculate the margin of error M, where [insert equation], with [standard deviation] representing the population standard deviation and n as the sample size. The standard deviation equals the square root of the variance. With a 0.95 probability level, if the margin of error desired is 5 or below, a sample size of at least 75 is required.
The initial time was 15.7 minutes.
Explanation of steps:
Let x represent the initial time (in minutes).
The relay team is working on minimizing their relay race duration.
First, they cut down their time by 2.1 minutes.
Afterwards, they manage to reduce that time by 10 percent.
If the concluding time ends up being 3.96 minutes, then
x-t1-t2= 3.6
x= 3.6+ t1+ t2
x= 3.6+ 2.1+ 10
x= 15.7
Thus, their starting time was 15.7 minutes.
Answer:
Conclusion from the given data:
a(x) = 2x - 4b(x) = x + 2
Next, we will review each option
First option
Second option

Third option

= x - 6
Fourth option 

= 3x - 2
From the above evaluations, only option A results in a quadratic function
Answer:
ACE = ECD is the solution
Step-by-step explanation: