answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
astraxan
1 day ago
9

A job shop consists of three machines and two repairmen. The amount of time a machine works before breaking down is exponentiall

y distributed with mean 10. If the amount of time it takes a single repairman to fix a machine is exponentially distributed with mean 8, then(a) what is the average number of machines not in use?(b) what proportion of time are both repairmen busy?
Mathematics
1 answer:
tester [3.9K]1 day ago
7 0

Answer:

Step-by-step explanation:

Define X(t) as the count of machines that are out of order at time t.

The specified issue is modeled with a birth-death process within the confined set

S={0, 1, 2, 3} alongside

\lambda_0=\frac{3}{10}, \mu_1=\frac{1}{8}\\\\ \lambda_1=\frac{2}{10}, \mu_2=\frac{2}{8}\\\\ \lambda_2=\frac{1}{10}, \mu_3=\frac{2}{8}

The balancing equations for the birth-death process are given by \lambda_sP_i=\mu_{s+1}P_{i+1},i=0,1,2

because the exiting rate = the entering rate

            0      \lambda_0P_0=\mu_1P_1

             1     (\lambda_1+\mu_1)P_1= \mu_2P_2 + \lambda_0P_0

             2   (\lambda_2+\mu_2)P_2= \mu_3P_3 + \lambda_1P_1

P_1=\frac{12}{5}P_0=P_0=\frac{5}{12}P_1\\\\P_2=\frac{48}{25}P_0=P_0=\frac{25}{48}P_2\\\\P_3=\frac{192}{250}P_0=P_0=\frac{250}{192}P_3

Since \sum\limits^3_{i=0} {P_i=1}\\\\p_0=[1+\frac{5}{12}+\frac{48}{25}+\frac{192}{250}]^{-1}=\frac{250}{1522}

a)

The average number of machines not in operation is reflected in the mean of the stationary distribution P_1+2P_2+3P_3=\frac{2136}{751}

b)

The fraction of time both repair technicians are engaged P_2+P_3=\frac{672}{1522}=\frac{336}{761}

You might be interested in
A veterinarian surveys her clients and finds that 32 percent of the households have dogs, 25 percent have cats, and 11 percent h
babunello [3635]

Answer:

C and D

Step-by-step explanation:

6 0
8 days ago
Read 2 more answers
A triangle drawn on a map has sides that measure 15 cm, 8 cm, and 10 cm. The shortest of the corresponding real-life distances i
Inessa [3907]

Establish a proportion.

8/127=15/x

Cross multiply

8x=1,905

Divide each side by 8

x=238.125

The greatest of the actual distances is 238.125 km.

Hope this clarification helps:)

5 0
7 days ago
The heights of 200 adults were recorded and divided into two categories.
AnnZ [3877]
The response is A

I hope this information is useful.
8 0
6 days ago
Read 2 more answers
A cycle race in France is 2214.5 miles in length. Miguel knows his average speed from previous races is 21.14 miles per hour. Fo
AnnZ [3877]

Answer: 12 days

Step-by-step explanation:

Distance = speed x time

2214.50 = 21.14 / t

t = 2214.50 / 21.14 = 104.75 hours

By cycling 9 hours each day, it will take

104.75 / 9 = 11.64 = 12 days

8 0
17 days ago
En una fábrica de automóviles que trabaja las 24 horas se arman diariamente 24
Svet_ta [4321]

Answer:

a. La ganancia total es de $ 4,060,000.00

b. 31 vehículos fabricados

Step-by-step explanation:

(a) Los datos suministrados son;

Cantidad de autos tipo sedán producidos = 24

Cantidad de SUV ensamblados = 16

Cantidad de vehículos tipo VAN producidos = 12

Cantidad de pick-ups fabricadas = 8

Cantidad de autos deportivos producidos = 2

Ganancia de los autos sedán vendidos = $ 185,000 - $ 140,000 = $ 40,000

Ganancia por las SUV vendidas = $ 320,000 - $ 250,000 = $ 70,000

Ganancia de los vehículos tipo VAN = $ 400,000 - $ 310,000 = $ 90,000

Ganancia de las pick-ups = $ 285,000 - $ 210,000 = $ 75,000

Ganancia de los autos deportivos vendidos = $ 550,000 - $ 400,000 = $ 150,000

La ganancia total se calcula de la siguiente manera: 24 * $ 40,000 + 16 * $ 70,000 + 12 * $ 90,000 + 8 * $ 75,000 + 2 * $ 150,000 = $ 4,060,000

(b) Debido a que hay una producción constante, solo se completará la mitad del total de automóviles en un lapso de 12 horas

Por lo tanto, se fabrican

12 sedanes, 8 SUV, 6 VAN, 4 pick-ups y 1 deportivo, alcanzando así un total de 31 vehículos.

6 0
14 days ago
Other questions:
  • George put some cards into a basket. Then he drew 3 cards out of the basket. Is this a random sample of cards in the basket? Why
    11·1 answer
  • The linear equation 3x – 11y = 10 has
    11·1 answer
  • 6. It is now 10:29 a.m., but when the bell rings at 10:30 a.m. Suzette will be late for French class for the third time this wee
    15·2 answers
  • Between what pair of numbers is the product of 289 and 7?
    10·1 answer
  • Matt invested $1500 into a stock of his choice. After two years, he had received
    9·1 answer
  • When factoring polynomials, why it is best to look for a greatest common monomial factor first?
    8·1 answer
  • The m6 = (11x + 8)° and m7 = (12x – 4)° What is the measure of 4? m4 = 40° m4 = 48° m4 = 132° m4 = 140°
    5·2 answers
  • A national survey of 50,000 sixth graders asked if they know what they would like to do when they get older. Suppose you ask 350
    9·2 answers
  • David wants to rent a bicycle for a couple of hours to explore the city. The price of the bike rental, (P)(P)left parenthesis, P
    5·1 answer
  • Grace claims that the interquartile range of a data set is never equal to its range. Which type of set can be used to prove or d
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!