6

A 3-phase, 50 Hz, 110 KV overhead line has conductors placed in a horizontal plane 3 m apart. Conductor diameter is 2.5 cm. If t

he line length is 220 km, determine the charging current per phase assuming complete transposition. (6 Marks)
Engineering
1 answer:
Viktor [391]13 days ago
6 0

Response:

A 3-phase, 50 Hz, 110 KV overhead line has conductors

Detailed explanation:

I hope this helps

You might be interested in
A murder in a downtown office building has been widely publicized. You’re a police detective and receive a phone call from a dig
choli [298]
Considering the plain view doctrine, which permits law enforcement and courts to seizure evidence of a crime without a warrant, provided the evidence is visible and observable by the officer. For any digital data relevant to a murder case gathered under this doctrine to be admissible for use against you, it must meet three criteria: 1. The digital evidence must be openly and clearly observable to the officer – this is the essence of "plain view". 2. The officer should have a lawful right to be in the location where the digital information was discovered related to the case. 3. The information's incriminating nature must be obvious, pointing to the murder; the officer's judgment based on probable cause will determine whether or not the data constitutes evidence.
7 0
18 days ago
Read 2 more answers
Write multiple if statements. If car_year is 1969 or earlier, print "Few safety features." If 1970 or later, print "Probably has
alex41 [359]

Answer:

The following includes the explanation, code, and resulting outputs.

C++ Code:

#include <iostream>

using namespace std;

int main()

{

int year;

cout<<"Enter the car model year."<<endl;

cin>>year;

if (year<=1969)

{

cout<<"Few safety features."<<endl;

}

else if (year>=1970 && year<1989)

{

cout<<"Probably has seat belts."<<endl;

}

else if (year>=1990 && year<1999)

{

cout<<"Probably has antilock brakes."<<endl;

}

else if (year>=2000)

{

cout<<"Probably has airbags."<<endl;

}

return 0;

}

Explanation:

The challenge involved displaying feature messages for a car based on its model year.

Logical conditions were integrated into the coding. The implementation has been verified with multiple inputs producing the expected results.

Output:

Enter the car model year.

1961

Few safety features.

Enter the car model year.

1975

Probably has seat belts.

Enter the car model year.

1994

Probably has antilock brakes.

Enter the car model year.

2005

Probably has airbags.

5 0
1 month ago
Consider 1.0 kg of austenite containing 1.15 wt% C, cooled to below 727C (1341F). (a) What is the proeutectoid phase? (b) How
pantera1 [306]

Answer:

a) The phase before eutectoid is commonly referred to as cementite, with the chemical formula Fe₃C.

b) The total mass of ferrite obtained is 0.8311 kg.

The total cementite mass equals 0.1689 kg.

c) The total cementite mass accounts for 0.9343 kg.

Explanation:

Provided:

1 kg of austenite

a carbon content of 1.15 wt%

Cooled below 727°C

Questions:

a) Identify the proeutectoid phase.

b) Calculate the mass of total ferrite and cementite, Wf =?, Wc =?

c) Determine the mass of both pearlite and the proeutectoid phase, Wp =?

d) Create a schematic to illustrate the resulting microstructure.

a) The proeutectoid phase is referred to as cementite with the formula Fe₃C.

b) To find the total mass of formed ferrite:

W_{f} =\frac{C_{cementite}-C_{2} }{C_{cementite}-C_{1} }

With:

Ccementite = composition of cementite = 6.7 wt%

C₁ = composition of phase 1 = 0.022 wt%

C₂ = overall composition = 1.15 wt%

Inserting the values yields:

W_{f} =\frac{6.7-1.15}{6.7-0.022} =0.8311kg

For the total mass of cementite:

W_{c} =\frac{C_{2}-C_{1}}{C_{cementite}-C_{1} } =\frac{1.15-0.022}{6.7-0.022} =0.1689kg

c) The mass of pearlite:

W_{p} =\frac{6.7-1.15}{5.94} =0.9343kg

d) The diagram illustrates the different compositions: (pearlite, proeutectoid cementite, ferrite, eutectoid cementite)

6 0
1 month ago
6. You are evaluating flow through an airway. The current flow rate is 10 liters per minute with a fixed driving pressure (P1) o
iogann1982 [368]

Answer:

B) P1 would have to increase to sustain the flow rate (correct)

C) Resistance would rise (correct)

Explanation:

Flow rate is measured at 10 liters per minute

Driving pressure (P1) stands at 20 cm H2O

Fixed downstream pressure (P2) is 5 cm H2O

The accurate statements when the lumen is pinched in the center of the tube are: P1 will increase to maintain the flow rate, and resistance will rise. This occurs because pinching the lumen decreases its diameter, leading to higher resistance, which is linearly related to pressure, thus P1 will also increase.

The incorrect statement is: the flow would decrease.

6 0
1 month ago
estimate the area for a landfill for 12000 p producing waste for 10 y. assume that the national average is
alex41 [359]

Answer:

1.015 ha.

Explanation:

To calculate the landfill area required for 12,000 people producing waste over 10 years, follow these steps:[STEP ONE: Calculate the average solid waste generated per person per year (kg p^-1 ^y(kg/py)).

According to the problem, the average solid waste produced is 2.78 kg per person daily (kg/pd), hence converting to kg/py involves:

2.78 × 365 days = 1014.7 kg/py.

STEP TWO: Determine yearly volume of refuse per person.

Thus, volume = 1014.7 kg/py ÷ 500 kg/m^3 = 2.03 m^3 per person per year.

STEP THREE: Calculate total solid waste volume over 10 years for 12,000 individuals.

Total waste volume over 10 years = 10 × 12,000 × 2.03 = 243,600 m^3.

STEP FOUR: Find the required area for the landfill.

Note: The total height for the landfill should be 20 + 4 = 24m.

Thus, the area for the landfill = 243,600 m^3 / 24m = 10,150 m^2.

If 10,000 m^2 equals 1 ha, then 10,150 m^2 ÷ 10,000 m^2 = 1.015 ha.

(f). Ensure to expand the landfill area for enhancements.

4 0
21 day ago
Other questions:
  • A fireboat is to fight fires at coastal areas by drawing seawater with a density of 1030 kg/m through a 20-cm-diameter pipe at a
    13·1 answer
  • The 10-kg block slides down 2 m on the rough surface with kinetic friction coefficient μk = 0.2. What is the work done by the fr
    7·1 answer
  • Water is flowing in a metal pipe. The pipe OD (outside diameter) is 61 cm. The pipe length is 120 m. The pipe wall thickness is
    9·1 answer
  • A long, circular aluminum rod is attached at one end to a heated wall and transfers heat by convection to a cold fluid.
    12·1 answer
  • A tank contains initially 2500 liters of 50% solution. Water enters the tank at the rate of 25 iters per minute and the solution
    13·1 answer
  • Marble A is placed in a hollow tube, and the tube is swung in a horizontal plane causing the marble to be thrown out. As viewed
    11·1 answer
  • A pipe in a district heating network is transporting over-pressurized hot water (10 atm) at a mass flow of 0.5 kg/s. The pipe is
    14·1 answer
  • Consider a rectangular fin that is used to cool a motorcycle engine. The fin is 0.15m long and at a temperature of 250C, while t
    5·1 answer
  • Select the qualification that is best demonstrated in each example.
    11·2 answers
  • The total floor area of a building, including below-grade space but excluding unenclosed areas, measured from the exterior of th
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!