Respuesta: Es C
Explicación paso a paso:
Tu gráfico debe ser este, con ambas líneas sólidas, dado que la línea X, o roja, debe estar al menos en -1 o más, y la línea Y, o azul, debe estar en +4 o más
Answer:
The upper limit for the height of the prism is 
Step-by-step explanation:
Let
x------> represent the height of the prism
It is known that
the area of the base of the prism must not exceed


thus
-------> inequality A
------> equation B
-----> equation C
Insert equation B into equation C

------> equation D
Substituting equations B and D into inequality A
-------> using a graphing tool to solve the inequality
The resultant solution for x lies in the interval---------->![[0,12]](https://tex.z-dn.net/?f=%5B0%2C12%5D)
consult the attached figure
but bear in mind that
The width of the base must be
meters shorter than the height of the prism
thus
the solution for x is confined to the interval ------> ![(9,12]](https://tex.z-dn.net/?f=%289%2C12%5D)
The maximum height of the prism equals 
Response:
The Work In Progress (WIP) limit is set at 0.50 days.
Detailed explanation:
Calculating WIP limits:
first, it is essential to determine the efficiency of the process and procedure, which can be calculated as follows:
Value Added Time = 12 days (arrival time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the minimum required throughput time is 0.25 days to achieve the maximum profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.