Answer:
13%
Detailed breakdown:
Information provided:
- MP = 2080
- Discount = d%
- VAT = (d-2)%
- Cost = 1997.84
Applying the discount:
- 2080 - d% = 2080*(1 - 0.01d)
Including VAT:
- 2080*(1 - 0.01d) + (d - 2)%
- 2080*(1 - 0.01d) * (1 + (d -2)/100)
- 2080*(1 - 0.01d) * (0.98 + 0.01d) = 1997.84
- (1 - 0.01d)(0.98 + 0.01d) = 1997.84/2080
- 0.98 + 0.01d - 0.0098d - 0.0001d² = 0.9605
- - 0.0001d² + 0.0002d + 0.98- 0.9605 = 0
- 0.0001d²- 0.0002d - 0.0195 = 0
- d² - 2d + 195 = 0
Solving this quadratic equation yields:
Therefore
Adam and his dad split the bill in a 2:3 ratio. The dad’s share equals the 3 parts and is £52.20, so one part is 52.20 ÷ 3 = £17.40. Adam’s portion (2 parts) is 2 × 17.40 = £34.80. The total cost is 34.80 + 52.20 = £87.00.
We start with the following information:
p = probability = 0.12<span>
n = total number of students = 39 </span>
x = number of left-handers = 5<span>
u = mean = p * n = 4.68
σ = standard deviation = √(n*p*(1-p)) = √(39 * 0.12 * 0.88) =
2.03</span>
Finding the z score:
z = (x – u) / σ
<span>
z = (5 – 4.68) / 2.03
</span>
z
= 0.1576 = 0.16
<span>
</span>Applying standard tables for z gives the p value as:
p value = 0.5636 = 56.36%
Consequently, there is a 56.36% probability.
It includes the procedures to reach that specific point.
Some of them are arranged incorrectly.
I will label them with letters.
The sequence is:
A: 2x+5=19
B: 2x+5-5=19-5
C: 2x=14
D: 2x/2=14/2
E: x=7
A: initial condition
B: we subtracted 5 from both sides based on the subtraction property of equality
C: perform the subtraction
D: applying the division property of equality (dividing both sides by 2)
E: result of the division