a) x_{cm} = m₂/ (m₁ + m₂) d, b) x_{cm} = 52.97 pm
If the position of an object is zero at a particular moment, this does not provide any indication about its velocity. It might simply be moving through that point, and you observed it exactly when it was at zero.
Energy can be determined using the formula power multiplied by time, thus for a power of 1200 W (or 1200 Joules per second) and a duration of 30 seconds, the calculation yields 36000 J or 36 kJ of electrical energy.
If you need the electrical charge or current: Power equals voltage times current. Therefore, with a power of 1200 watts and a voltage of 120 V, the current can be found as 1200 W divided by 120 V, which results in 10 Amperes. The charge is obtained by multiplying 10 A by 30 s, yielding 300 C.
Answer:
2.5 m
Explanation:
Billboard worker's weight = 800 N
Number of ropes = 2
Length of scaffold = 4 m
Weight of scaffold = 500 N
Tension present in rope = 550 N
The total torques will be

The worker is positioned at 2.5 m